How many cement bags required for 1400 sq ft rcc roof slab

How many cement bags required for 1400 sq ft rcc roof slab | cement required for 1400 sq ft roof | cement required for 1400 sq ft slab | how much cement is required for 1400 sq ft slab | how much cement do i need for 1400 sq ft slab.

To pour a 1,400 square foot, 4″ thick RCC roof slab, you will need a total of 97 bags of cement, 5″ thick – 122 bags and 6″ thick – 147 bags cement with a 1:2:3 mix (cement: sand: aggregate) to achieve a concrete compressive strength of 3,000 psi in 28 days.

How many cement bags required for 1400 sq ft rcc roof slab
How many cement bags required for 1400 sq ft rcc roof slab

Cement is one of the important ingredient of concrete, generally it is mix in concrete due to adhesive and binding nature with fine and coarse aggregate. A small amount of lime is also added in concrete mix to increase the workability and strength of concrete.

There is different grade of concrete such as M20, M25, M30 and so on, used for RCC flat roof slab casting, in this article we used the nominal mix ratio 1:2:3 (1 part cement is mixed with 2 part sand and 3 part aggregate) those prepared mix concrete have compressive strength of 3000 PSI.

Generally roof slab thickness is kept about 4 inch thick at general a standard used for residential building and thickness of 5 to 6 inch for commercial use, in this article we calculate cement required for RCC roof slab at 4 inch, 5 inch and 6 inch thickness.

Roof slab casting is process of laying and putting concrete mix in horizontal direction and structure over brickwork. Cast of roof slab reinforcement main bar and cross bar in distributed over shuttering areas of roof slab and then we put concrete mix of M20 or m25 grade of concrete that is known as roof slab casting.

How many cement bags required for 1400 sqft roof slab?

Roof slab casting is process of laying and putting concrete mix in horizontal direction and structure over brickwork. Cast of roof slab reinforcement main bar and cross bar in distributed over shuttering areas of roof slab and then we put concrete mix of M20 or m25 grade of concrete that is known as roof slab casting.

Generally one bag of Portland cement is weight around 50 kg and their density is 1440 kg/m3.

Calculate how many cement bags required for 1400 sq ft roof slab at 6 inch thick

● Given details:-
1) thickness of roof slab = 6″
2) mix ratios = 1:2:3
3) Area of roof slab = 1400 sq ft
4) Density of cement =1440kg/m3
5) 1 bag cement weight = 50 kg

● Calculation of wet volume of concrete:- you can determine quantity of concrete by calculating its volume by multiplying square footage of roof slab with their thickness such as – 1) thickness in feet = 6/ 12 = 0.5 feet, 2) wet volume of concrete = 1400 sq ft × 0.5 feet = 700 cubic feet, thus you will need 700 cubic feet of wet volume of concrete for 1400 sq ft rcc roof slab

● Dry volume:- we know that wet volume have voids and pore which filled with water and bubbles it can be remove by vibrator or compressor machine so more quantity of material is required that is dry volume. Volume of dry concrete is increased by 54%, so we can multiply 1.54 in wet volume to calculate dry volume. Dry volume of concrete = 700 cubic feet × 1.54 = 1078 cubic feet. Thus you will need 1078 cubic feet of dry volume of concrete for 1400 sq ft rcc roof slab

● Mix ratio:- 1:2:3 mix ratio (1 part cement is mixed with 2 part sand and 3 part aggregate) is used for prepairing concrete mix. Add this mix ratio 1+2+3 = 6, part of cement in mix = 1/6.

● Calculate cement for 1400 sq ft roof slab:-
1) cement quantity in cubic feet =1/6 × dry volume of concrete, 1078 ÷6= 180 cubic feet approx

2) cement quantity in cubic meters =1/6 × dry volume of concrete ÷ 35.32, (1078 ÷6) ÷ 35.32 = 5.10 cubic meters approx

3) cement quantity in kg = cement quantity in m3 × 1440 kg/m3 = 5.10× 1440 = 7344 kg approx

4) cement quantity in No. of bags = cement quantity in kg ÷ 50 kg = 7344 ÷ 50 = 147 bags approx.

Conclusions:-
For a 1400 sq ft rcc roof slab casting at 6 inch thick, generally you will need 147 bags (around 7344 kg) of cement which is approximately equal as 180 in cubic feet or in 5.10 cubic meter by using 1:2:3 (cement: sand: aggregate) mix to gain 3000 Psi compressive strength of concrete in 28 days. Thus 147 bags of cement are required for 1400 sq ft rcc roof slab at 6 inch thick.

2D and 3D Ghar ka Naksha banane ke liye sampark kare
2D and 3D Ghar ka Naksha banane ke liye sampark kare

Calculate how many cement bags required for 1400 sq ft roof slab at 5 inch thick

● Calculation of wet volume of concrete:-
1) thickness in feet = 5/ 12 = 0.416 feet, 2) wet volume of concrete = 1400 sq ft × 0.416 feet = 583 cubic feet

● Dry volume of concrete = 583 cubic feet × 1.54 = 898 cubic feet. Thus you will need 898 cubic feet of dry volume of concrete for 1400 sq ft rcc roof slab at 5 inch thick

● Calculate cement for 1400 sq ft roof slab:-
1) cement quantity in cubic feet =1/6 × dry volume of concrete, 898 ÷6= 150 cubic feet approx

2) cement quantity in cubic meters = volume of concrete in cubic feet ÷ 35.32, (150 ÷ 35.32 = 4.25 cubic meters approx

3) cement quantity in kg = cement quantity in m3 × 1440 kg/m3 = 4.25 × 1440 = 6120 kg approx

4) cement quantity in No. of bags = cement quantity in kg ÷ 50 kg = 6120 ÷ 50 = 122 bags approx.

Conclusions:-
For a 1400 sq ft rcc roof slab casting at 5 inch thick, generally you will need 122 bags (around 6120 kg) of cement which is approximately equal as 150 in cubic feet or in 4.25 cubic meter by using 1:2:3 (cement: sand: aggregate) mix to gain 3000 Psi compressive strength of concrete in 28 days. Thus 122 bags of cement are required for 1400 sq ft rcc roof slab at 5 inch thick.

◆You Can Follow me on Facebook and

Subscribe our Youtube Channel

Calculate how many cement bags required for 1400 sq ft roof slab at 4 inch thick

● Calculation of wet volume of concrete:-
1) thickness in feet = 4/ 12 = 0.33 feet, 2) wet volume of concrete = 1400 sq ft × 0.33 feet = 462 cubic feet

● Dry volume of concrete = 462 cubic feet × 1.54 = 712 cubic feet. Thus you will need 712 cubic feet of dry volume of concrete for 1400 sq ft rcc roof slab at 4 inch thick

● Calculate cement for 1400 sq ft roof slab:-
1) cement quantity in cubic feet =1/6 × dry volume of concrete, 712÷6= 119 cubic feet approx

2) cement quantity in cubic meters = volume of concrete in cubic feet ÷ 35.32, (119 ÷ 35.32 = 3.37 cubic meters approx

3) cement quantity in kg = cement quantity in m3 × 1440 kg/m3 = 3.37 × 1440 = 4853 kg approx

4) cement quantity in No. of bags = cement quantity in kg ÷ 50 kg = 4853 ÷ 50 = 97 bags approx.

Conclusions:-
For a 1400 sq ft rcc roof slab casting at 4 inch thick, generally you will need 97 bags (around 4853 kg) of cement which is approximately equal as 119 in cubic feet or in 3.37 cubic meter by using 1:2:3 (cement: sand: aggregate) mix to gain 3000 Psi compressive strength of conc sq ft rcc roof slab |

ALSO READ :-

How many cement bags required for 3000 sq ft rcc roof slab

How many cement bags required for 2400 sq ft rcc roof slab

How many cement bags required for 2000 sq ft rcc roof slab

How many cement bags required for 1800 sq ft rcc roof slab

How many cement bags required for 1400 sq ft rcc roof slab

Final conclusions:-
For a 1400 sq ft rcc roof slab casting at 4 inch thick, generally you will need 97 bags (around 4853 kg) of cement, at 5 inch thick – 122 bags (around 6120 kg) and at 6 inch thick – 147 bags (around 7344 kg) of cement are required by using 1:2:3 (cement: sand: aggregate) mix to gain compressive strength of 3000 Psi concrete in 28 days.