How much steel required for 400 sq ft slab at 4″ & 5″ thickness

How much steel required for 400 sq ft slab at 4″ & 5″ thickness. The amount of steel required for a concrete slab depends on various factors, including the thickness of the slab, the type of load it will bear, and the structural requirements. To calculate the steel required, you would typically need to know the design specifications.

For a 4-inch thick slab, you might need approximately 0.5-0.75 pounds of steel rebar per square foot. So, for a 400 sq ft slab, you could need around 200-300 pounds of steel.

For a 5-inch thick slab, you might need a bit more steel, approximately 0.6-0.9 pounds of steel rebar per square foot. So, for a 400 sq ft slab at 5 inches thick, you could require around 240-360 pounds of steel. These are rough estimates, and the actual requirements can vary based on specific design and structural considerations.

How much steel required for 400 sq ft slab at 4" & 5" thickness
How much steel required for 400 sq ft slab at 4″ & 5″ thickness

Rebar is short form of reinforcing bar, it is steel bar or Steel wire provided as tension bar, used in reinforced concrete structure like column, beam and slab of house construction and it also used in reinforced masonry structure. It is used to increase the strength of concrete structure.

Actual Steel calculation is based on as per design but if design is not given then Steel calculation is based on Thumb Rule on experience basis.

In roof slab reinforcement we provide there is a two types of Steel bar used main bar and cross bar.

1) Main bar:- main bar is also called as shortest span bar usually used at bottom of slab having spacing 4 inch between the two bar. Main bar is also called tension Steel because it is provided in tension zone of roof slab in bottom having tensile strength of steel is enough yield strength and ultimate tensile strength.

We should use higher tensile steel in main bar Fe550D. sufficient amount of main bar used in shorter direction having 10 mm or 12 mm dia of Steel bar according to roof slab reinforcement.

2) Cross bar:- cross bar is also called as longer span bar or distribution bar or cross bar mainly used at top of the main bar in compression zone of slab, cross bar usually dia of 8mm or 10 mm bar Steel bar used in longer direction according to roof slab reinforcement.

Actual Steel calculation is based on as per design but if design is not given then Steel calculation is based on Thumb Rule on experience basis. In this article you know about how much steel required for 400 sq ft slab at 4″ & 5″ thickness.

How much steel required for 400 sq ft slab at 4″ & 5″ thickness

According to Indian standard rcc concrete roof slab thickness in residential building construction is 4 inches (100mm). Use of 5″ to 6″ (125mm to 150mm) is recommended if the concrete will receive occasional heavy loads.

Thumb Rule for Steel in RCC slab :-
Generally Thumb Rule for Steel in RCC slab construction is ranging between between 80 kg to 90 kg per cubic metre per wet volume of concrete of RCC slab.

According to general rules and guidelines, a 400 square foot RCC roof slab with a thickness of 4 inches generally requires 300 kg to 340 kg of steel, and a 5 inch thick slab requires 380 kg to 425 kg of steel.

How much steel required for 400 sq ft slab 4″ thickness

Steel required for 400 sq ft RCC roof slab at 4 inch thickness. Multiply area and thickness to calculate wet volume of concrete. Volume of 400 sq ft of RCC slab at 4 inches thick in m3 = (400 × 4/12) ÷ 35.32 = 3.78 m3

At 4″ thickness, the total quantity of steel required for 400 sq ft (3.78 cubic meters) RCC roof slab is equal to = 80 × 3.78 = 300 kg. This means, 300 kg of steel is needed per 400 sq ft of 4-inch thick RCC roof slab.

How much steel required for 400 sq ft slab 5″ thickness

Steel required for 400 sq ft RCC roof slab at 5 inch thickness. Multiply area and thickness to calculate wet volume of concrete. Volume of 400 sq ft of RCC slab at 5 inches thick in m3 = (400 × 5/12) ÷ 35.32 = 4.72 m3

At 5″ thickness, the total quantity of steel required for 400 sq ft (4.72 cubic meters) RCC roof slab is equal to = 80 × 4.72 = 380 kg. This means, 380 kg of steel is needed per 400 sq ft of 5-inch thick RCC roof slab.

How much steel required for 400 sq ft slab 6″ thickness

Steel required for 400 sq ft RCC roof slab at 6 inch thickness. Multiply area and thickness to calculate wet volume of concrete. Volume of 400 sq ft of RCC slab at 6 inches thick in m3 = (400 × 6/12) ÷ 35.32 = 5.66 m3

At 6″ thickness, the total quantity of steel required for 400 sq ft (5.66 cubic meters) RCC roof slab is equal to = 80 × 5.66 = 450 kg. This means, 450 kg of steel is needed per 400 sq ft of 6-inch thick RCC roof slab.

How to calculate steel required for 400 square feet slab

1. Convert thickness in feet

2. Calculate wet volume of concrete = square footage × thickness in feet

3. Convert cubic feet into cubic metres

4. Taking steel quantity 80 kg to 90 kg per cubic meter volume of concrete

Assuming it a normal residential building with light loading conditions, thickness of slab will be 4 inch thick. For example if your plan area = 20 × 20 = 400 sq ft, so for the plan area of 400 sq ft total volume of concrete required = 400×0.33 ÷ 35.3147 = 3.74 m3, as per thumb rule 80 kg to 90 kg of steel are required per cubic meter volume of concrete, so as 80 kg × 3.74 = 300 kg or 90 kg × 3.74 = 337 kg, thus, you will need 300 kg to 337 kg of steel required for 400 sq ft of rcc roof slab at 4 inch thickness.

2D and 3D Ghar ka Naksha banane ke liye sampark kare
2D and 3D Ghar ka Naksha banane ke liye sampark kare

Conclusions:-
As per thumb rules and generals guide line, for a 400 sq ft rcc roof slab at 4 inch thickness, generally you will need 300 kg to 337 kg of steel quantity. Thus 300 kg to 337 kg of steel quantity are required for 400 square feet slab at 4″ thickness of normal residential building with light loading conditions.

For office, school building, steel may increase marginally due to live load condition,thickness of slab will be 5 inch thick, so for the plan area of 400 sq ft total volume of concrete required = 400 × 0.416 ÷ 35.3147 = 4.72 m3, as per thumb rule 80 kg to 90 kg of steel are required per cubic meter volume of concrete, so as 80 kg × 4.72 = 378 kg or 90 kg × 4.72 = 425 kg, thus, you will need 378 kg to 425 kg of steel required for 400 sq ft of rcc roof slab at 5 inch thickness.

◆You Can Follow me on Facebook and

Subscribe our Youtube Channel

Conclusions:-
As per thumb rules and generals guide line, for a 400 sq ft rcc roof slab at 5 inch thickness, generally you will need 378 kg to 425 kg of steel quantity. Thus 378 kg to 425 kg of steel quantity are required for 400 square feet slab at 5″ thickness of normal commercial building, office, school building. Steel may increase marginally due to live load condition.

For office, school building, steel may increase marginally due to live load condition. For multistorey buildings, steel will increase further. With increase in span and load, thickness of slab will also increase.

But as a thumb rule, for normal slab, it is 80–90kg per cubic metre volume. More simple formula for residential flat, steel required in kg = area of slab in sft. This will give maximum limit. You can take 85% of it for normal residential building with 3 meter span.

ALSO READ :-

How much steel required for 1600 sq ft slab

How much steel required for 1500 sq ft slab

How much steel required for 900 sq ft slab

How much steel required for 1200 sq ft slab

How much steel required for 1400 sq ft slab

How much steel required for 800 sq ft slab

Final conclusions:
As per thumb rules and generals guide line, for a 400 sq ft rcc roof slab at 4 inch thickness, generally you will need 300 kg to 337 kg of steel quantity and at 5 inch thickness of slab, 378 kg to 425 kg of steel quantity are required.