How many yards of concrete do I need for a 30×40 slab

How many yards of concrete do I need for a 30×40 slab | how much concrete do I need for a 30×40 slab | how many cubic feet of concrete do I need for a 30×40 slab | How many yards of concrete do I need for a 30×40 slab at 4″ thick | How many yards of concrete do I need for a 30×40 slab at 5″ thick | How many yards of concrete do I need for a 30×40 slab at 6″ thick.

Weight of Ready mix concrete in dry condition is about 133 lbs per cubic foot, 3600 lbs per cubic yard, or approximately equal as 2136 kg per cubic meter. The weight of concrete is determined by its density, which can vary based on the amount of aggregate, water, and air in the mix.

In United States, based on Imperial and US customary measurement system, 1 cubic yard is unit of measurement of volume represented by 3 feet long by 3 feet wide by 3 feet depth (3’×3’×3′ = 27 cubic feet), so 1 cubic yard is equal to 27 cubic feet.

You need to calculate the volume of concrete in cubic yard or in cubic feet or in cubic meter or in rmc truck before ordering the mixed concrete. Volume is calculated by multiplying length, width and depth of slab. Here you have given a slab of 30 feet in length and 40 feet in wide at 4 inches thick, it’s depend on, is this a slab on the ground or it is elevated, rules differ for both, since failure of ground slab would not kill anyone whereas failure of an elevated slab could.

Thumb rules involves the safety factor that deciding the thickness of slab, 4 inch thick is generally for ground slab, heavy traffic and heavy load, you should take depth 5 or 6 inch thick and for an elevated slab generally thickness should be 5″ to 6″, and 4 inch thick is also made to use in normal conditions.

Generally standard thickness of slab is 4 inch thick in normal conditions, if slab have heavy traffic and heavy load, you should take depth 5 or 6 inch thick. In this article we have to calculate required quantity of concrete in cubic yard & in cubic feet and cubic meter for a 30×40 (1200 sq ft) slab at 4 inch, 5 inch or 6 inch thick.

For small project you can purchase the concrete bag which are available in different bag size and weight condition such as 40lb, 60lb bag, 80lb bag, 90lb bag and etc and for large project you may ordering the contractors for ready mix concrete in cubic yard, they can supply it in truck commonly known as rmc or dump truck. there are several sizes of RMC truck on road, most common concrete truck has drum capacity of 11 to 15 cubic yards, however due to weight limit on the road they can carry 8 to 11 cubic yard of concrete. Most common is 8 & 10 cubic yards, for road Project small lots of concrete need to be transferred to various location so small truck may hold 5 cubic yards.

How many yards of concrete do I need for a 30×40 slab

To determine the how much concrete do I need for a 30×40 slab, you can solve in following steps:-

Step 1 :- calculate the volume in cubic feet:- you have given 30×40 slab (length × width), consider it is 4 inch thick, 4 inch = 0.33 feet, to determine the volume of slab, you need to multiply all dimensions, such that = 30′×40′× 0.33′ = 396 cubic feet, at 5 inch thick, volume of slab is 30′×40′× 0.416 = 500 cubic feet and at 6 inch thick, volume of slab is 30′×40′× 0.5 = 600 cubic feet.

Step 2 :- converting cubic feet into cubic yard:- now converting into cubic yard, you should divide it by 27, so volume of concrete you needed for 30×40 slab at 4 inch thick in cubic yard = 396/27 = 15 cubic yards, at 5 inch thick = 500/27 = 18.5 cubic yards & at at 6 inch thick = 600/27 = around 22.5 cubic yards.

Step 3:- add 10% extra which would be wastage during mixing and pouring.

Regarding this, “how many yards of concrete do I need for a 30×40 slab?”, at 4 inches thick, generally you will need approximately 15 yard or 396 cubic feet of ready mix concrete for a 30×40 slab, at 5 inches thick slab 18.5 yards or 500 cubic feet of readymix concrete are required, while at 6 inches thick slab approximately 22.5 yards or 600 cubic feet of readymixed concrete is necessary.

How many yards of concrete do I need for a 30×40 slab
How many yards of concrete do I need for a 30×40 slab

How much concrete do I need for a 30×40 slab

Regarding this, “how much concrete do I need for a 30×40 slab?”, at 4 inches thick, generally you will need approximately 15 yard or 396 cubic feet of ready mix concrete for a 30×40 slab, at 5 inches thick slab 18.5 yards or 500 cubic feet of readymix concrete are required, while at 6 inches thick slab approximately 22.5 yards or 600 cubic feet of readymixed concrete is necessary.

How much concrete do I need for a 30×40 slab at 4″ thick

Regarding this, “how much concrete do I need for a 30×40 slab at 4″ thick?”, at 4 inches thick, generally you will need approximately 15 yard or 396 cubic feet of ready mix concrete for a 30×40 slab. Mathematical calculation:- 1) first calculate the volume in cubic feet by multiplying all dimension such that = 30′×40′× 4″ = 30′×40′× 0.33′ = 396 cubic feet, 2) to determine the volume of slab in cubic yards, you should divide it by 27, so volume of concrete you needed for 30×40 slab at 4 inch thick in cubic yard = 396/27 = 15 cubic yards.

How much concrete do I need for a 30×40 slab at 5″ thick

Regarding this, “how much concrete do I need for a 30×40 slab at 5″ thick?”, at 5 inches thick, generally you will need approximately 18.5 yard or 500 cubic feet of ready mix concrete for a 30×40 slab. Mathematical calculation:- 1) first calculate the volume in cubic feet by multiplying all dimension such that = 30′×40′× 5″ = 30′×40′× 0.416′ = 500 cubic feet, 2) to determine the volume of slab in cubic yards, you should divide it by 27, so volume of concrete you needed for 30×40 slab at 5 inch thick in cubic yard = 500/27 = 18.5 cubic yards.

◆You Can Follow me on Facebook and

Subscribe our Youtube Channel

How much concrete do I need for a 30×40 slab at 6″ thick

Regarding this, “how much concrete do I need for a 30×40 slab at 6″ thick?”, at 6 inches thick, generally you will need approximately 22.5 yard or 600 cubic feet of ready mix concrete for a 30×40 slab. Mathematical calculation:- 1) first calculate the volume in cubic feet by multiplying all dimension such that = 30′×40′× 6″ = 30′×40′× 0.5′ = 600 cubic feet, 2) to determine the volume of slab in cubic yards, you should divide it by 27, so volume of concrete you needed for 30×40 slab at 6 inch thick in cubic yard = 600/27 = 22.5 cubic yards.

Cost estimate for a 30’×40′ slab

For the most part, the typical concrete slab price range of $4 to $8 per square foot includes labour. A 30×40 slab is a 1,200 square foot. Using ready-mix concrete to cover 30×40 (1,200 sq ft) at a depth of 4″ to 6″-8″, the estimated cost is range between $4,800 to $9,600 (1,200× $4 = $4,800 or 1,200×$8 = $9,600).

How much does a 30’×40’×4″ concrete slab cost?

Pouring a concrete slab may cost between $4 and $8 per square foot. A 4″ thick slab will cost an average cost of $4 per square foot. Based on the national average, a 30’×40’×4″ (1,200 square feet) concrete slab may cost about $4,800 (1,200 times $4 = $4,800).

How much does a 30’×40’×5″ concrete slab cost?

Pouring a concrete slab may cost between $4 and $8 per square foot. A 5″ thick slab will cost an average cost of $5 per square foot. Based on the national average, a 30’×40’×5″ (1,200 square feet) concrete slab may cost about $6,000 (1,200 times $5 = $6,000).

How much does a 30’×40’×6″ concrete slab cost?

Pouring a concrete slab may cost between $4 and $8 per square foot. A 6″ thick slab will cost an average cost of $6 per square foot. Based on the national average, a 30’×40’×6″ (1,200 square feet) concrete slab may cost about $7,200 (1,200 times $6 = $7,200).

How much does a 30’×40’×8″ concrete slab cost?

Pouring a concrete slab may cost between $4 and $8 per square foot. A 8″ thick slab will cost an average cost of $8 per square foot. Based on the national average, a 30’×40’×8″ (1,200 square feet) concrete slab may cost about $9,600 (1,200 times $8 = $9,600).

Conclusion:

If you have a 30×40 slab with 4 inches thick, you would need 15 cubic yards (396 cubic feet) of ready-mix concrete which will cost range between $4,800 to $9,600 including labour.

More Important Posts:―

  1. Quantity of water required per 50kg bag of cement for M20, M15 & M25 concrete
  2. How many tons in a cubic yard of sand
  3. How many cement bags per square meter for plastering?
  4. Labour rate for building construction in India
  5. What is the weight of 1m3 of reinforced concrete

Primary Sidebar

Categories

  • AAC block (19)
  • Asphalt (1)
  • beam (9)
  • board (2)
  • Brick (61)
  • Cement (106)
  • Cement test types (2)
  • Compressive strength (10)
  • Concrete (297)
  • Cubic feet (1)
  • deck (6)
  • door (1)
  • drywall (20)
  • feet (1)
  • flooring (17)
  • gallon (1)
  • garage (2)
  • garage door (2)
  • gravel (8)
  • joists (8)
  • Land measurement (20)
  • mulch (2)
  • Paint/ putty calculator (21)
  • plywood (3)
  • Rate Analysis for civil work (2)
  • RCC (176)
  • Road/ highway (13)
  • Roof slab (41)
  • sand (2)
  • siding (17)
  • soil (2)
  • Soil mechanic (10)
  • span (9)
  • stairs (1)
  • steel (1)
  • storey (7)
  • Tile (32)
  • Uncategorized (857)
  • wallpaper (5)
  • Weight of Steel (50)
  • सिविल नॉलेज इन हिंदी (21)

Recent Posts

  • How much water does a round pool hold (12ft, 15ft, 18ft, 21ft, 24ft, 20ft, 25ft, 30ft)
  • How many bags of concrete do i need for a 10×10 slab
  • How many tons of gravel in a dump truck
  • How long does it take to paint a room (12×12, 10×10 & 20×20)

Popular Post

How much water does a round pool hold

How much water does a round pool hold (12ft, 15ft, 18ft,…

How many bags of concrete do i need for a 10x10 slab

How many bags of concrete do i need for a 10×10 slab…

How many tons of gravel in a dump truck

How many tons of gravel in a dump truck…

How long does it take to paint a room

How long does it take to paint a room (12×12, 10×10 &…

Things You Need to Know Before You Hire Junk Removal…

Cubic Feet in Engineering and Construction: Definition,…

Footer

About Us

At CivilSir, we share all the information related to civil engineering. So if you are a civil engineering student this is the best platform where you can improve your knowledge.

Newsletter

To get update of latest post signup below by giving you email address.

Follow Us

DMCA.com Protection Status

Copyright © 2023 CivilSir About Us Guest PostContact usPrivacy policySitemap