Labour rate for building construction in India

Labour rate for building construction in India, Hi guys in this article we know about labour rate for building construction, civil work and also know about plastering, brickwork, RCC work, PCC work, etc. per square foot or per square metre in india.

Labour rate & cost in civil construction depends on various factors 1) the type of building: whether residential/commercial/institutional or industrial. 2) It depends on the type of construction: whether it is a RCC building or a steel building. 3)There are other factors also involved like : number of floors required. Loading on the floor, area where the building is to be constructed, soil conditions, site filling requirements etc.

◆You Can Follow me on Facebook and Subscribe our Youtube Channel

You should also visits:-

1)what is concrete and its types and properties

2) concrete quantity calculation for staircase and its formula

Labour rate for building construction in India

Labour rate per square foot:– In india, Labour rate & cost per square foot is around 210 to 300 Rs for Residential/commercial/ institutional building, it contains labour cost approx 140 to 200 Rs per square foot for building a structure or civil work and around 70 to 100 Rs per square foot for finishing like tiling, electrical fitting, plumbing fixture, painting and putty, door framing and fabrication and miscellaneous work like curing, repair, storage and security.

Labour rate per square meter:– In india, Labour rate & cost per square meter is around 2300 to 3200 Rs for Residential/commercial/ institutional building, it contains labour cost approx 1550 to 2150 Rs per square meter for building a structure or civil work and around 750 to 1050 Rs per square meter for finishing like tiling, electrical fitting, plumbing fixture, painting and putty, door framing and fabrication and miscellaneous work like curing, repair, storage and security.

In india, Labour rate for earthwork excavation is around 10 to 12 Rs per cft (cubic foot) or 354 to 424 Rs per cubic meter (m3). hydraulic excavator can excavate 240 m3 of soil in one day. Its cost per day including driver and fuel is Rs. 5000.

In india,Labour rate for footing concrete is around 35 to 40 Rs per cft (cubic foot) or 1250 to 1400 Rs per cubic meter (m3).

In india, Labour rate for column concrete is around 50 to 60 Rs per cft (cubic foot) or 1750 to 2100 Rs per cubic meter (m3).

In india, Labour rate for RCC roof slab and beam concrete is around 50 to 60 Rs per cft (cubic foot) or 1750 to 2100 Rs per cubic meter (m3).

In india, Labour rate for RCC slope roof concrete is around 70 to 75 Rs per cft (cubic foot) or 2500 to 2650 Rs per cubic meter (m3).

In india, Labour rate for PCC concrete is around 30 to 35 Rs per sq ft (square foot) or 320 to 400 Rs per cubic meter (m3).

In india, Labour rate for bar bending of steel is around 7 to 12 Rs per kg or 7000 to 12,000 Rs per ton.

In india, Labour rate for block/brick work is around 20 to 35 Rs per square foot, it depends on thickness of block/ brick wall, for 8″ thick block/brick wall it will cost around rs 35/sq ft, for 6″ thick block/brick wall it will cost around rs 26/sq ft and for 4″ thick block/brick wall it will cost around rs 20/sq ft.

In india, Labour rate for plastering is around 12 to 25 Rs per square foot, it depends on thickness and types of plaster, for 20mm thick external wall plaster it will cost around 18 to 25 Rs per sq ft, for 12mm internal plaster it will cost around 15 to 18 Rs per sq ft and for 6mm thick ceiling/concrete wall plaster it will cost around 12 to 15 Rs per sq ft.

Labour rate for building construction in India
Labour rate for building construction in India

Building a structure there is different labour rate are following:- upto plinth level including footing =rs 50/ sq ft, upto 1st slab =rs 45/sq ft, brickwork = rs 25/sq ft, plaster = rs 20/sq ft and for finishing and miscellaneous is electrical fitting =rs 8/sq ft, plumbing fixtures = rs 15/sq ft, painting & putty = rs 10/sq ft, door, frame and fabrication = rs 10/sq ft, flooring = rs 20/ sq ft and for miscellaneous for curing, repair, storage and security = rs 5/sq ft.

  • Share on Facebook
  • Tweet on Twitter

More Important Posts:―

  1. What is specific gravity and water absorption of fine aggregate
  2. What is aggregate its types and properties
  3. How to calculate cement sand and aggregate quantity in m15 concrete
  4. How to calculate quantity of concrete block and mortar for wall
  5. 1 cubic meter 20 mm aggregate weight in Kg

Primary Sidebar

Categories

  • AAC block (12)
  • Brick (38)
  • Cement (61)
  • Cement test types (2)
  • Compressive strength (7)
  • Concrete (108)
  • Land measurement (18)
  • Rate Analysis for civil work (2)
  • RCC (78)
  • Roof slab (25)
  • Tile (7)
  • Uncategorized (228)
  • Weight of Steel (27)

Recent Posts

  • What are different branches of civil engineering?
  • Clear cover for slab beam column staircase and footing
  • What is the column size for 2, 3 and 4 storey building?
  • Minimum size of RCC column as per IS 456

Popular Post

What are different branches of civil engineering?

What are different branches of civil engineering?…

Clear cover for slab beam column staircase and footing

Clear cover for slab beam column staircase and footing…

What is the column size for 2, 3 and 4 storey building?

What is the column size for 2, 3 and 4 storey building?…

Minimum size of RCC column as per IS 456

Minimum size of RCC column as per IS 456…

Minimum thickness of RCC slab as per IS 456

Minimum thickness of RCC slab as per IS 456…

Minimum flooring thickness in any residential building

Minimum flooring thickness in any residential building…

Footer

About Us

At CivilSir, we share all the information related to civil engineering. So if you are a civil engineering student this is the best platform where you can improve your knowledge.

Newsletter

To get update of latest post signup below by giving you email address.

Follow Us

DMCA.com Protection Status

Copyright © 2021 CivilSir About UsPrivacy PolicySitemapGo To Top।