What does M10, M15, M20, M25, M7.5 mean in concrete?

What does M10, M15, M20, M25, M7.5 mean in concrete? | what does 20 means in M20 concrete | what does M10 mean in concrete | what does M20 mean in concrete | what does M15 mean in concrete.

Grade of concrete is define as the strength of concrete measured after 28 days of curing. The grade of concrete construction is based on structural integrity and type of concrete mix. Nominal mix of concrete is generally used in small scale construction, whereas design mix is used in large scale constructions.

What does M10, M15, M20, M25, M7.5 mean in concrete?
What does M10, M15, M20, M25, M7.5 mean in concrete?

There are 3 types of concrete as per strength: 1) Lean concrete, 2) ordinary concrete, and 3) Standard concrete. M5 and M7.5 are put in category of lean concrete, M10 and M15 is ordinary concrete and M20, M25 and higher are standard grade of concrete.

In the classification of concrete mix, the letter M denotes the Mix and the numerical figures 7.5, 10, 15, 20, 25, 30, 35, 40 represent the predetermined characteristics of compressive strength of concrete @28 Days in N/mm2 or in MPa when tested with 15cm × 15cm × 15cm cube.

The mixes of grades M10, M15, M20 and M25 correspond approximately to the mix proportions 1:3:6 (1 cement : 3 Sand: 6 stone), 1:2:4 (1 cement : 2 Sand: 4 stone), 1:1.5:3 (1 cement : 1.5 Sand: 3 stone) and 1:1:2 (1 cement : 1 Sand: 2 stone) respectively.

Characteristic strength of concrete is their compressive strength which can be determined by axial compression test on cubic concrete block or cylinder shape. If Compression test is carried on cubic concrete block, when tested with cube size 15cm × 15cm × 15cm, that’s known as Cubic test and their strength is called cubic strength.

What does M7.5 mean in concrete

M7.5 concrete is low strength lean concrete. In concrete M7.5 means, the letter M denotes the Mix and the numerical figure 7.5 represent the predetermined compressive strength of concrete @28 Days in N/mm2 or in MPa when tested with 15cm × 15cm × 15cm size cube.

The common nominal concrete mix ratio to create M7.5 concrete is 1:4:8. This means, 1 part of Portland cement mixed to 4 parts of sand and 8 parts of stone by volume. If you measure components of concrete by bucket, so, one bucket of cement will mix with 4 bucket of sand and 8 bucket of stone.

What does M5 mean in concrete

M5 concrete is low strength lean concrete. In concrete M5 means, the letter M denotes the Mix and the numerical figure 5 represent the predetermined compressive strength of concrete @28 Days in N/mm2 or in MPa when tested with 15cm × 15cm × 15cm size cube.

The common nominal concrete mix ratio to create M5 concrete is 1:5:10. This means, 1 part of Portland cement mixed to 5 parts of sand and 10 parts of stone by volume. If you measure components of concrete by bucket, so, one bucket of cement will mix with 5 bucket of sand and 10 bucket of stone.

◆You Can Follow me on Facebook and

Subscribe our Youtube Channel

What does M10 mean in concrete

M10 concrete is ordinary concrete. In concrete M10 means, the letter M denotes the Mix and the numerical figure 10 represent the predetermined compressive strength of concrete @28 Days in N/mm2 or in MPa when tested with 15cm × 15cm × 15cm size cube.

The common nominal concrete mix ratio to create M10 concrete is 1:3:6. This means, 1 part of Portland cement mixed to 3 parts of sand and 6 parts of stone by volume. If you measure components of concrete by bucket, so, one bucket of cement will mix with 3 bucket of sand and 6 bucket of stone.

What does M15 mean in concrete

M15 concrete is ordinary concrete. In concrete M15 means, the letter M denotes the Mix and the numerical figure 15 represent the predetermined compressive strength of concrete @28 Days in N/mm2 or in MPa when tested with 15cm × 15cm × 15cm size cube.

The common nominal concrete mix ratio to create M15 concrete is 1:2:4. This means, 1 part of Portland cement mixed to 2 parts of sand and 4 parts of stone by volume. If you measure components of concrete by bucket, so, one bucket of cement will mix with 2 bucket of sand and 4 bucket of stone.

What does M20 mean in concrete

M20 concrete is standard concrete. In concrete M20 means, the letter M denotes the Mix and the numerical figure 20 represent the predetermined compressive strength of concrete @28 Days in N/mm2 or in MPa when tested with 15cm × 15cm × 15cm size cube.

The common nominal concrete mix ratio to create M20 concrete is 1:1.5:3. This means, 1 part of Portland cement mixed to 1.5 parts of sand and 3 parts of stone by volume. If you measure components of concrete by bucket, so, one bucket of cement will mix with 1.5 bucket of sand and 3 bucket of stone.

What does M25 mean in concrete

M25 concrete is standard concrete. In concrete M25 means, the letter M denotes the Mix and the numerical figure 25 represent the predetermined compressive strength of concrete @28 Days in N/mm2 or in MPa when tested with 15cm × 15cm × 15cm size cube.

The common nominal concrete mix ratio to create M25 concrete is 1:1:2. This means, 1 part of Portland cement mixed to 1 parts of sand and 2 parts of stone by volume. If you measure components of concrete by bucket, so, one bucket of cement will mix with 1 bucket of sand and 2 bucket of stone.

◆ M20 concrete mix ratio for 1 cubic meter in kg

◆ Concrete grade: M25, M20, M15, M10 & M7.5, meaning, their uses & mix ratio

◆ How much concrete will a 94 pound bag of Portland cement make?

◆ What is the mix ratio for C20, C25, C30, C35 and C40 concrete

◆ What is the 10-20-30-40 rule in concrete mixing?

Conclusion:

In concrete mix, the letter M denotes the Mix and the numerical figures 7.5, 10, 15, 20, 25, 30, 35, 40 represent the predetermined characteristics of compressive strength of concrete @28 Days in N/mm2 or in MPa when tested with 15cm × 15cm × 15cm cube.