To figure out concrete yardage, follow these steps:

1. Measure the Area: Measure the length, width, and depth (or thickness) of the concrete area in feet. Ensure that all measurements are in the same units (usually feet).

2. Calculate the Volume: Multiply the length, width, and depth to calculate the volume of the concrete in cubic feet. The formula is: Volume = Length × Width × Depth.

3. Convert to Cubic Yards: Since concrete is typically sold by the cubic yard, you’ll need to convert the volume from cubic feet to cubic yards. There are 27 cubic feet in 1 cubic yard, so divide the cubic feet volume by 27 to get the cubic yardage. Cubic Yards = Cubic Feet / 27

4. Add Extra: It’s a good idea to add a bit extra to your calculated yardage to account for spillage, over-excavation, and any other unexpected factors. A common rule of thumb is to add 10% to 15% to the calculated cubic yardage.

Here’s an example: Let’s say you’re pouring a concrete slab that measures 10 feet in length, 6 feet in width, and 0.25 feet (3 inches) in depth. Volume = 10 ft × 6 ft × 0.25 ft = 15 cubic feet. Cubic Yards = 15 cubic feet / 27 = 0.56 cubic yards. Adding 10% for extra, you might order approximately 0.62 cubic yards of concrete.

Concrete is the mixture of Portland cement, sand (fine aggregates), gravel (coarse aggregate), water and different types of approved admixture or ingredients. Concrete is prepared in different varieties, it is available in dry condition in premixed bagged concrete, or ready mix concrete which are prepared in batching plant by mixture machine, or it is manually mix at construction site by taking required ratio of cement, sand, gravel and water.

Modern era demanding the concreting work for various purpose such as casting of different slab, for making patio, ramps, footing, filling holes, holes post, different types of column, beam, shelter house, street, pathway, roadway, house construction, bridge formation, making heavy dams, canals and channels and in different types of construction industry.

In United States concrete are sold in bag concrete for small projects, popularly known as premix bag such as larger size of 90lb and 80 pound, medium size of 60 pound and smaller size of 40 and 50 pound. A 50 pound concrete is fast setting concrete. Premixed concrete bags are used for driveways, patios, foundations walls and footings, curbs, stairs and structural applications and also great for setting footings, pouring slabs and anchoring posts and poles.

In US, generally for larger projects, Ready mixed concrete is calculated by the yards, which is is good for making Large patios, driveways, pool decks and more, foundation slabs for a house, parking lots or commercial sidewalks.

Larger jobs such as driveways, roadway, and larger slab are simple easier to complete when ordering concrete by the cubic yards, buying by the truckload is typically about total of 10 cubic yards, though this can very from company to company. If you are ordering less than truckload of concrete can as expect to pay extra per cubic yard.

Rather than trying to mix a concrete bag after bag by hand. But for smaller jobs, like a walkway, modest patio or footings, you should calculate the number of concrete bags instead. Bagged concrete is ideal for Pouring small slabs for sidewalks or patios, setting posts for fences or mailboxes, making repairs to foundation walls, walkways or steps, pouring small curbs, steps, or ramps footings for decks, pergolas, walls and more.

You Can Follow me on Facebook and

Subscribe our Youtube Channel

In this article you know about “how to figure out concrete yardage” and how do you calculate yardage formula for concrete for different shape and size of slab, which will help you making a rough estimate how much concrete yardage needed. Here we discussed about how to figure up concrete yardage

Weight of concrete is defined by weight of its mixture ingredient of cement, sand, gravel and small amount of water. How much is a yard of concrete weigh is depending upon dry concrete, wet concrete, broken concrete, mixing ratio, type of concrete grade, concrete strength, whether it is reinforced or without steel.

● Calculator for concrete yardage

● How much is a bag of concrete

◆ Calculator for concrete bags

What is a cubic yard of concrete?, In United States, based on Imperial and US customary measurement system, A cubic yard of concrete is unit of measurement of volume, which is visually represented by 3 feet long by 3 feet wide by 3 feet depth, so, 1 cubic yard of concrete is 3’×3’× 3′ = 27 cubic feet, so 1 cubic yard of concrete is equivalent to 27 cubic feet.

How to figure out concrete yardage

A cubic yard of solid slab of concrete, which visually is 3 feet long by 3 feet wide and by 3 feet height, which is equal as 27 cubic feet when multiply length by width by height = 3’×3’×3′ = 27 cubic feet.

To figure out concrete yardage, multiply the length by the width to determine square footage. Convert the thickness from inches to feet. Multiply the thickness in feet by the square footage to determine cubic feet. Convert cubic feet to cubic yards by multiplying by 0.037 or dividing by 27.

To figure up concrete yardage: cubic footage of concrete × 0.037 or cubic footage of concrete ÷ 27. Measure the all dimensions in feet. Multiply length by width, and then by thickness to determine cubic footage. Divide the resulting number by 27 or multiply by 0.037 to find cubic yardage of concrete (because 1 cubic yardage = 27 cubic footage.

If you want to make rough estimate of how much concrete yardage needed, use the formula of concrete to find out amount of concrete, which are following:-

Calculate concrete yardage formula:

1) Yardage of concrete = Cubic footage of concrete × 0.037 or,

2) Yardage of concrete = Cubic footage of concrete ÷ 27, or

3) Cubic yardage of concrete = (Length in feet × Width in feet × Thickness in feet) ÷ 27.

How do you calculate yardage for concrete

To calculate yardage of concrete needed you do the following calculation steps:-

1) Determine how thick you want the concrete, and measure the length and width that you’d like to cover

2) Multiply the length by the width to determine square footage

3) Convert the thickness from inches to feet

4) Multiply the thickness in feet by the square footage to determine cubic footage

5) Convert cubic footage to cubic yardage by multiplying by 0.037.

For example:- how to figure out concrete yardage for 10×10 solid slab at 4 inches thick. Ans. maths calculation:- 1) square footage of slab = 10’×10′ = 100 sq ft, 2) 4 inches thickness in feet = 4÷12 = 0.33′, 3) Cubic foot of concrete = 100 × 0.33 = 33 cubic footage, and 4) Cubic yardage of concrete = 33 × 0.037 = 1.22 yardage

Thus, you will need approximately 1.22 cubic yardage, or 33 cubic footage, or 2.5 tons of ready mix concrete for 10 by 10 (10’×10′) slab at suggested depth of 4 inches thick.

:- Calculator for concrete yardage

How much is a bag of concrete

Calculate weight of concrete slab

Calculator for concrete bags

How to calculate cubic yards of concrete

Conclusions:-

To figure out concrete yardage, multiply the cubic footage by 0.037 or divide by 27 to determine cubic yardage of concrete needed.