How to calculate 2000 sq ft rcc slab cost,2000 sq ft rcc slab construction cost,in this topic we know about How to calculate 2000 sq ft rcc slab cost for the roof cast 2000 square feet building roof slab, you have require Steel bar ,sand, cement and aggregate,how much sand, cement & aggregate required for 2000 sq ft rcc roof slab?
you know that for the casting of roof slab we used generally M20 or M25 mix concrete.
● M-20 mix grade of Concrete:-In M20 mix concrete M is stand for mix and numerical figure 20 is stand for characteristic of compressive strength 20N/mm2 after mixing and casting of roof slab,
quantity of material in slab formation it calculated by M20 mix in which ratio of sand cement and aggregate is 1: 1.5 :3 in which one part is cement and 1.5 is sand and 3 part is aggregate.
●M20-mix Ratio : 1 : 1.5 : 3 in which one part is cement 1. 5 part is sand and 3 part is aggregate
How to calculate 2000 sq ft rcc roof slab cost
● Steel bar calculation:- In roof slab there is a two types of Steel bar used main bar and cross bar:-
1) Main bar:- it is also called as shortist span bar usually used at bottom of slab having spacing 4 inch between the two bar, main bar used in shorter direction having 12 mm dia of Steel bar.
💐—- WATCH THIS VIDEO—-💐
2) Cross bar:- it is also called as longer span bar or distribution bar mainly used at top of the main bar, cross bar usually dia of 10mm Steel bar used in longer direction.
● Given dimensions:-
Thickness of slab=5″
Area of slab = 2000 sq ft
M -20 -mix =1:1.5:3 (concrete)
●Volume Calculation of rcc
1) wet volume=Area × thicknessof slab
Vw = wet volume of concrete
Vw= 2000 sq ft× 5″
Vw= 2000 sq ft×5/12′
Vw = 833.33 cft
If you want to convert it into cubic metre you should divide by 35.3147
1m3 =35.3147 cft
Wet volume= 833.33/35.3147=23.59 m3
2) Dry volume:-
we know that wet volume have water and bubbles it can be remove by vibrator or compressor machine so more quantity of material is required hence dry volume is increased by 54 percent of wet volume , so we can multiply 1.54 in wet volume to calculate dry volume
Dry volume = wet volume × 1.54
Vd =1.54 × 23.59 m3
Dry volume= 36.63 m3
How much steel required for 2000 sq ft rcc roof slab & their cost
quantity of steel required in rcc roof slab is about 0.5℅ to 1% of dry volume then average is 0.75% of dry volume
Weight =0.75%of dry volume×density of steel
Density of steel is=7850 kg/m3
W =0.75/100× 36.63m3 ×7850kg/m3
Weight= 2139 kg
2139 kg weight of steel bar is require for construction of 2000 square feet rcc roof slab
If Market rate of steel bar is 60 rupees per kg than
total cost of Steel bar = 2139×rs 60
Total cost= Rs 128351
● Ans. :- 2139 kg weight of steel bar is require for construction of 2000 square feet rcc roof slab & their cost is Rs 128351
How much sand required for 2000 sq ft rcc roof slab & their cost
In M20 ratio of sand cement and aggregate is 1:1.5:3 ,in this ratio 1.5 part is sand
Total proportion =1+1.5+3=5.5
Volume of sand in cft
Volume =1.5 /5.5× 36.63×35.3147 cft
Volume of sand =352.8 cft
Market rate of sand is very according to locality and availability of material If market rate of 80 rupees per CFT than total cost of quantity of sand
Total cost =rs80×352.8
=Rs 28227
● Ans. :- 352.8 cuft of sand quantity is required for construction of 2000 square feet rcc roof slab & their cost is rs 28227.
◆You Can Follow me on Facebook and Subscribe our Youtube Channel
You should also visits:-
1)what is concrete and its types and properties
2) concrete quantity calculation for staircase and its formula
3) how to calculate weight of mild steel plate and derive its formula
4) calculate quantity of cement Sand for brickwork of 10m3
5) cement calculation in tile work of hundred square foot area
6) weight calculation of Steel bar and its formula
7) what is admixture of concrete and its types and its properties
How many cement bags required for 2000 sq ft rcc roof slab & their cost
in M20 mix 1 part is cement quantity
Weight of cement=1/5.5×dry volume in m3×density of cement
Density of cement=1450kg/m3
Weight =1/5.5×36.63 m3×1450 kg/m3
Weight = 9657 Kg
1 bag cement =50kg
No.of bags =9657/50
Cement = 193 Bags cement
If market rate of cement is 350 rupees per bags then total cost
Total cost =193 ×rs 350
= Rs 67599
● Ans. :- 193 bags (9657kg) of cement is required for construction of 2000 square feet rcc roof slab & their cost is rs 67599
How much aggregate required for 2000 sq ft rcc roof slab & their cost
in M20 mix there is 3 part of aggregate quantity
Volume of aggregate=3/5.5×dry volume in CFT
Volume =3/5.5× 36.63×35.3147 cft
Volume of aggregate = 705.7 cft
If market rate of aggregate is is 70 rupees per CFT then total cost of aggregate
Total cost =rs 70× 705.7
Rs=rs 49398
● Ans. :- 705.7 cu ft aggregate is required for construction of 2000 square feet RCC roof slab & their cost is rs 49398
cost of construction of 2000 square feet RCC roof slab
Cost of steel=rs 128351 ( 2139 kg)
Cost of cement=rs 67599 (193 bags)
Cost of sand=rs 28227 (352.8 cuft)
Cost of stone = rs 49398 (705.7 cuft)
Labour charge and machine cost =rs 100000 (approx)
● Ans. Rs 373575 is total construction cost of 2000 square feet RCC roof slab
Hence total cost of roof slab of 2000 square feet building require rs 373575
●Now your turn:- please like and comment it above this post, if you have any query and question about this please you will ask, thanks a”lot.
Dearsir,
Really very nice. superb. I am totally satisfied with this calculation. Easily understandable by a Laymen.
Thanking you.
Good and clear calculation
Thanks
Really very very nice calculation. I really appreciate your explanation .